FPSO Cidade de Angra dos Reis MV22
The FPSO Cidade de Angra dos Reis MV22 is moored in 2,149m of water in the Tupi field, Santos Basin.
MODEC converted the VLCC "M/V Sunrise IV" into the FPSO. The FPSO is capable of processing up to 100,000 barrels of oil per day and 5 million m3 of gas. The facility is designed for H2S and CO2 removal and is capable of reinjecting CO2 downhole at 550 bar in addition to exporting sales gas to shore. The FPSO will initially gather production from five subsea wells and has the ability to accommodate four additional production wells in the future.
The contract is for a 15 year lease with 5 one-year options. The FPSO is designed to remain on the field for up to 20 years.
Scope of Work
- Engineering
- Procurement
- Construction
- Mobilization
- Commissioning
- Operation and Maintenance
| Unit Name | FPSO Cidade de Angra dos Reis MV22 |
|---|---|
| Contract | EPCI + Time Charter |
| First Oil | October 2010 |
| Charter Period | 15 years + 5 one-year options |
| Client | Petróleo Brasileiro S.A. (Petrobras) |
| Status | In Operation (MODEC owns and operates) |
| Field Location | Tupi Field |
|---|---|
| Country | Brazil |
| Water Depth | 2,149 m |
| New/Conv | Conversion |
| Mooring Type | SOFEC Spread Mooring |
| Storage Capacity | 1,600,000 bbls |
|---|---|
| Oil Production | 100,000 bopd |
| Gas Production | 150 mmscfd |
| Water Injection | 100,000 bwpd |